Hyperscale data centers

Capital for powered sites and hyperscale campuses

A campus is financed against the capacity it can deliver and when it can deliver it. 925 Capital evaluates powered land, build-to-suit campuses, and phased expansions in the context of the power path, tenant commitments, and capital required at each stage.

01What we evaluate

Four questions shape every campus

  1. 01

    Powered site and utility status

    Site control and documented utility service are the starting point. We look at what the utility has studied, committed, or contracted, and what remains to be resolved.

  2. 02

    Build-to-suit and tenant commitment

    The form and timing of the tenant commitment determine how much development and construction risk the capital structure must carry before lease execution.

  3. 03

    Phased load and energization

    Campuses rarely energize at once. Capital is sized to each phase of substation, electrical, and shell delivery as load ramps.

  4. 04

    Development-to-construction capitalization

    The handoff from development capital to construction capital is set by specific conditions: permits, utility agreements, long-lead equipment, and tenant terms.

02Deal structure

What moves the structure

Each item below changes who carries risk and when capital can be committed. Weak evidence on any one of them typically shifts the structure toward more conditional, staged funding.

Site control
Ownership, option, or lease position and the term it covers.
Utility service evidence
Studies, letters, and agreements that support the power path.
Substation scope
Who builds, owns, and pays for the interconnecting infrastructure.
Key permits
Zoning, environmental, and building approvals on the critical path.
Delivery milestones
The sequence that connects capital draws to energized capacity.

03How we read capacity

Precise terms for power and load

When we publish figures, we separate site or utility capacity from IT load, state whether capacity is planned, committed, or energized, and give an as-of date. We do not describe available inventory or firm delivery dates without approved evidence.

Capacity status definitions
StatusMeaning
PlannedCapacity in a development plan, not yet supported by executed utility or tenant agreements.
CommittedCapacity supported by executed agreements, with energization still ahead.
EnergizedCapacity physically delivered and in service.
Data center with timber facade set behind a community lawn and native planting (illustrative)

Illustrative image. Well-sited campuses screen equipment, landscape their edges, and give back usable open space.

Planning a campus or the next phase of one?

Tell us where the project stands.

A first conversation starts with the market, the power requirement, the target delivery date, and the capital decision in front of you.