Power and generation
Capital for generation and power infrastructure
Generation becomes financeable when offtake, permitting, and the construction schedule support a credible path to commercial operation. 925 Capital evaluates how those commitments fit the capital needs of generation and grid-supporting projects.
01Pathways
Two ways power reaches the load
Utility-served
The project delivers into the grid, and the data center or other load takes service from the utility. Interconnection and tariff terms govern timing.
Co-located or behind-the-meter
Generation sits with, or directly serves, the load. Contractual and regulatory structure between generator, load, and utility must be resolved early.
02What we evaluate
The commitments that make a project financeable
01
Offtake and power purchase agreements
The counterparty, term, and pricing of the offtake anchor the long-term value of the project and the leverage it can support.
02
Utility and interconnection status
Queue position, study results, and interconnection agreements determine when power can be delivered and what network upgrades are required.
03
Fuel and permitting, where applicable
Fuel supply arrangements and environmental and land-use permits are often on the critical path to construction.
04
Equipment and EPC commitments
Long-lead equipment reservations and engineering, procurement, and construction terms set schedule certainty and the allocation of delivery risk.

Illustrative image. Not a 925 Capital project.
03Milestones and risk
Construction and COD shape the funding
Capital is drawn against construction progress and released toward commercial operation. Delays in equipment delivery, interconnection, or permitting move risk between parties, so the structure has to say in advance who absorbs it.
Project and construction responsibilities remain with the relevant sponsor, operator, utility, or delivery partner. 925’s role is in the capital structure.
Tell us where the project stands.
A first conversation starts with the market, the power requirement, the target delivery date, and the capital decision in front of you.