Capital for generation and power infrastructure

Generation becomes financeable when offtake, permitting, and the construction schedule support a credible path to commercial operation. 925 Capital evaluates how those commitments fit the capital needs of generation and grid-supporting projects.

01Pathways

Two ways power reaches the load

Utility-served

The project delivers into the grid, and the data center or other load takes service from the utility. Interconnection and tariff terms govern timing.

Co-located or behind-the-meter

Generation sits with, or directly serves, the load. Contractual and regulatory structure between generator, load, and utility must be resolved early.

02What we evaluate

The commitments that make a project financeable

  1. 01

    Offtake and power purchase agreements

    The counterparty, term, and pricing of the offtake anchor the long-term value of the project and the leverage it can support.

  2. 02

    Utility and interconnection status

    Queue position, study results, and interconnection agreements determine when power can be delivered and what network upgrades are required.

  3. 03

    Fuel and permitting, where applicable

    Fuel supply arrangements and environmental and land-use permits are often on the critical path to construction.

  4. 04

    Equipment and EPC commitments

    Long-lead equipment reservations and engineering, procurement, and construction terms set schedule certainty and the allocation of delivery risk.

Solar arrays with grazing sheep and pollinator planting beside a timber-clad battery building (illustrative)

Illustrative image. Not a 925 Capital project.

03Milestones and risk

Construction and COD shape the funding

Capital is drawn against construction progress and released toward commercial operation. Delays in equipment delivery, interconnection, or permitting move risk between parties, so the structure has to say in advance who absorbs it.

Project and construction responsibilities remain with the relevant sponsor, operator, utility, or delivery partner. 925’s role is in the capital structure.